Staging of material

Most paver tasks will vary depending upon access, website conditions, job size and of course, the weather condition. These situations can have a total impact on your task from a timing stand point. Careful factor to consider ought to be required to identify the time to begin the paver installation. Always aim to avoid any traffic or decrease on the prepared locations.

The supervisor or project supervisor need to always have the materials (sand/ pavers) distributed around the task site for efficient and easy installations. Paver pallets/bundles should be placed in a manner not to interfere with the paver installation. The appropriate pallet/bundle placement can make the real task installation easier and quicker by lowering the total labor of handling the material.

Brick paver patterns

Pavers can be positioned in several patterns depending on their shape. Each paver shape will usually have numerous various hatch patterns that are offered by the producer.

The laying pattern and shape of the paver is extremely important to the performance of the application. Contractors have to consider the traffic weight loads on their paver jobs. 90 or 45 degree herringbone patterns are suggested in all street and driveway applications, as these patterns will supply the maximum load support required and will withstand sneaking from the turning of tires and braking or starting of vehicular traffic. In many applications worldwide, it has actually been revealed that pavers laid in a herringbone pattern have actually performed sufficiently.

Pavers that are 60 mm (2 - 3/8 in) density appropriate for pedestrian applications. Pavers that are going to be utilized in business or commercial applications should be 80 mm (3 - 1/8 in) in density.

Reference/starting point for brick paver installation

There are a variety of conditions that determine the starting point of a paver task.

When beginning to set up pavers it is best to snap a real straight chalk line on the surface of the bed linen sand or pull a true straight string line above the surface of the bedding sand at the completed elevation of the pavers This will assist as a guide for maintaining straight joint lines and will likewise enable the installer to make adjustments in the positioning of the pavers.

Buildings and concrete suppressing are normally not straight and must not be utilized for developing straight joint lines. The usage of string lines is necessary to figure out the true straightness of the edge. As the paver installation progresses, the string lines will assist lessen the requirement for small trim pieces.

These will keep a minimum joint width and allow the bedding and jointing sand to go into in between each paver. Pavers with spacer bars are normally not laid in snug versus each other because a string line will supply consistent joint spacing.

Installation of brick pavers.

One of the most commonly utilized techniques for the installation of pavers is hand installation of each paver. It is best to install a single row of pavers along one of the real straight lines that you have pulled or above the bedding sand. The best technique is to put a paver against another one and let it slide down into the bedding sand.

When installing pavers on a steep grade, they ought to be installed at the base of the grade going uphill. This will prevent the pavers from creeping as they are being laid.

On large commercial and industrial applications, hand laying pavers would not be cost effective due to the labor intensity. The very best method for setting up pavers on big tasks is to install them mechanically. The use of a mechanical laying machine can install around 6000 - 7000 sq ft a day. There are a couple products a specialist need to think about prior to setting up pavers mechanically:

1.) Mechanical installers are just efficient in setting up pavers in specific patterns.

2.) The professional must make sure that the manufacturer can production and bundling pavers in the wanted pattern on the pallets for simple mechanical installation.

Poor color blending might result in an irregular looking installation. Many producers are consistent with color mixing on each package of pavers, however it is the professional's responsibility to ensure correct mixing in the field.

Cutting procedures for brick pavers.

Contractors typically have 2 methods of cutting pavers. Pavers are cut either by 1). A double bladed guillotine or by 2). A gas powered cut off saw or brick saw which is equipped with a diamond blade. The diamond blade cut-off saw or brick saw will provide a much cleaner and more accurate cut. The majority of brick saws will have a pipe accessory on them which will enable the operator to cut the pavers wet. When cutting pavers wet, it will help decrease dust and will extend the diamond blades life also. The operator of the brick saw should constantly cut the pavers far from the surface of the paver field when cutting wet, due to that the pavers will develop a slurry that will stain the paver surface. Pavers that are cut ought to not fit tight, enough spacing needs to be readily available for jointing sand.

The brick saw operator must constantly use the correct defense that is needed for operating a saw, such as eye, ear, breathing and hand security ).

Edging types

Edge restraints play a significant function in the total success of an interlocking pavement installation Edging restraints eliminate lateral motion of the pavers and hold the pavers tightly together. Especially at the outer boundary of the paver application, without an edging restraint, your task is guaranteed to stop working over time.

Usually produced edge restraints are the most frequently utilized by contractors. Manufactured edging restraints can range from, plastic edging, steel and aluminum, lumbers or precast concrete and stone.

Edging installation.

This could result in the migration of the bed linen sand and eventual lateral motion of the pavers. If there is a possibility of losing bed linen sand between the pavers and the edge restraint, then geo textile material is recommended. When a gap in between the pavers and the edging exceeds 3/8" (10mm), then the space should be filled with cut pavers.

Compaction of brick pavers.

After installation, the pavers need to be compressed. The whole area that is to be compressed should be swept clean of any foreign objects and particles that can trigger scuffing or scratching on the surface of the pavers.

It is important to have a compactor that can exert between 3000lbs. And 5000 pounds. Of centrifugal compaction force. In addition, it is very important that the very first compaction occurs before any jointing sand has been applied to the pavers. This can trigger a bridging problem and will not allow the joints to be totally filled with jointing sand if jointing sand is used to the pavers before compaction takes place. This can also prevent the pavers from being effectively set into the bed linen sand.

When condensing the pavers, it is suggested that you make at least two passes in different instructions across the pavers. This will enable the pavers to be properly embeded in the bedding sand and will force the bedding sand up into the joints from the bottom of the pavers.

The compaction of the pavers is really critical to the last efficiency of the pavers. Koi Pond Florida Failure to do correct compaction can result in contortions and pavement failure gradually.


Paver pallets/bundles must be put in a manner not to interfere with the paver installation. One of the most widely utilized approaches for the installation of pavers is hand installation of each paver. The operator of the brick saw should always cut the pavers away from the surface of the paver field when cutting damp, due to the reality that the pavers will create a slurry that will stain the paver surface. Edging restraints get rid of lateral motion of the pavers and hold the pavers securely together. When a space between the pavers and the edging surpasses 3/8" (10mm), then the area should be filled with cut pavers.